STRUCTURE |
EARTH-QUAKE |
EARTH-QUAKE RESISTANT R.C.C FRAMED CONSTRUCTION |
WALL FINISH |
INTERNAL |
ONE COAT CEMENT PRIMER OVER P.O.P FINISHED WALL(EXCLUDING COLOUR PAINTING) |
FLOORING |
FLAT, COMMON PLACE, PARKING |
FLAT’S FLOOR WILL BE FINISHED WITH VERIFIED Tiles & COMMON PALCE FLOOR WILL BE FINISHED WITH KOTA STONE PARKING FLOOR WILL BE FINISHED WITH CEMENT NEAT PUNNING |
TOILETS |
WALLS FITTINGS |
WHITE GLAZED TILES UPTO 7’ HEIGHT. A WASH BASIN, A TOWEL RAIL,A HOT &COLD WATER PIPE SYSTEM AND EWC/INDIAN, STYLE PAN, ONE MIRROR(EXCLUDING WATER HEATER) |
KITCHEN |
PLATFORM, DADO |
A WORKING PLATFORM OF MARBLE TOP WITH STAINLESS STEEL SINK. GLAZED TILES UPTO 2’-0’ OVER WORKING PLATFORM |
DOOR |
FRAME, SHUTTER |
HARD WOOD SEASONED CHOUKHAT 32 MM FACTORY MADE FLUSH DOOR. |
WINDOW |
|
WOODEN WINDOW WITH GLASS IN PANNEL |
ELECTRICAL |
|
ALL ELECTRICAL WIRING IN CONCEALED COPPER, P.V.C CONDUITS CONVENIENT PROVISON OF LIGHTS AND POWER PHASE AS WELL AS T.V & TELEPHONE POINTS IN DRAWING ROOM. |
WATER SUPPLY |
|
24 HOURS FROM OWN TUBEWELL AND OVER HEAD TANK SYSTEM |